Saturday night, March 31st, Courtney's band Venus Murphy played three sets at a local pub. The show was a smashing success, splendid time guaranteed, but it was pretty tired out by the time we were done. This probably explains why Courtney and Tara didn't get up to Wavey Creek to work on the boat until, well, some time after noon the next day.
So we didn't get a ton of work done. The things we did accomplish are pretty exciting, though. At left you can see the centre-plate case, finally assembled. We're getting very close to actually putting the various pieces together.
To the right is one of the frames (this one is number five), sitting on top of the freezer for some final patching before we assemble everything. We'll be putting in some good long boatbuilding days over the Easter long weekend, and final patching and smoothing of the frames is probably the first job we'll try to get through.
Then we'll start attaching the frames to the construction frame, which is pictured on the left. At that point, the boat really starts taking shape, so there will be lots of pictures. The shop door is in the background (you can probably see the CP case back there, too); the bow end of the construction frame is in the foreground.
Finishing the construction frame felt like a really major step, even though we didn't actually do that much work on Sunday (Courtney sez "Tell that to my knees", 'cause he was kneeling on concrete to screw the construction frame together...). We can't wait to start putting the "big picture" together!